Work Hours Calculator
Enter the start and finish times, the unpaid break in minutes and the number of working days. The calculator subtracts the break once per day, handles a shift that passes midnight, and reports both clock-style and decimal hours.
Answer
Paid time per week
35 h
7 paid hours per day across 5 days.
Rounded for display. The working shows the exact value.
- paid each day
- 420 min
- paid each week
- 2,100 min
- days per week
- 5
Check the work
Every line comes from the same calculation as the answer.
paid time = clock interval − unpaid break
| daily paid minutes | 17:00 − 09:00 − 60 min | 420 |
|---|---|---|
| weekly paid minutes | 420 × 5 | 2,100 |
| weekly hours | 2,100 ÷ 60 | 35 |
How it works
A timesheet usually needs paid time, not simply the distance between two clock readings. This calculator separates the gross interval from the unpaid break, then repeats the paid daily result for the number of working days you enter. That makes 09:00–17:00 with a 60-minute lunch equal to 7 paid hours, not 8.
The arithmetic is done in minutes so the break is unambiguous. Start and finish times become minutes after midnight; if the shift is overnight, one full day is added before the finish is compared with the start. The break is removed after that interval is found. The weekly result is daily paid minutes multiplied by the number of matching workdays.
A decimal hour is a different display of the same quantity. Seven hours 30 minutes is 7.5 hours, not 7.30. To convert, divide minutes by 60; to convert back to hours and minutes, take whole hours and the remaining minutes.
Use this page when the schedule is described by a start, a finish and an unpaid break. Use Time Duration when you only need the elapsed interval and do not want to remove a break. Use Date difference when the endpoints are calendar dates rather than clock readings. Naming the question first prevents a correct duration from being mistaken for paid time.
The weekly number is a repeated-schedule result, not a prediction of a real calendar. Entering five days means the same paid interval is counted five times. If Monday is long, Friday is short, or breaks vary, calculate the patterns separately and add their paid minutes. The page deliberately keeps this choice visible instead of hiding a default workweek inside the formula.
A break can be paid or unpaid depending on the workplace policy. This calculator removes the value you enter; it does not decide whether an employment rule requires a break, whether a break is interrupted, or whether overtime begins at a particular threshold. Those are policy questions that should be checked against the applicable contract or law.
Formula
daily = (end − start + overnight × 1,440) − break; weekly = daily × days; decimal hours = minutes ÷ 60
The calculator removes the unpaid break after finding the full clock interval, then repeats the result for the entered number of days.
Worked examples
- Try these numbers
Standard five-day schedule
- 09:00 to 17:00 is 480 minutes.
- 480 − 60 = 420 paid minutes per day.
- 420 × 5 = 2,100 minutes, and 2,100 ÷ 60 = 35 hours.
The schedule is 7 paid hours per day and 35 paid hours per week.
- Try these numbers
Overnight four-day schedule
- 22:00 to 06:00 next day is 480 minutes.
- 480 − 30 = 450 paid minutes per shift.
- 450 × 4 ÷ 60 = 30 paid hours per week.
Each shift is 7 hours 30 minutes; four shifts total 30 hours.
- Try these numbers
A shorter Friday
- 08:30 to 15:00 is 390 minutes.
- 390 − 30 = 360 paid minutes.
- 360 ÷ 60 = 6 decimal hours.
The entered day contains 6 paid hours.
Inputs and results
- Start time
- 24-hour clock start in HHMM notation.
- End time
- 24-hour clock finish.
- Unpaid break
- Minutes removed from each day.
- Working days
- Number of days with the same schedule.
- Daily decimal hours
- Paid minutes in one day divided by 60.
- Weekly decimal hours
- Daily paid minutes multiplied by days, divided by 60.
When to use it
- Prepare a weekly timesheet from a repeated schedule.
- Compare schedules with different lunch or unpaid break lengths.
- Calculate a night shift that starts on one calendar day and ends on the next.
Common mistakes
- Entering a paid break as unpaid and reducing the result twice.
- Forgetting to mark overnight when a shift ends after midnight.
- Using 7.30 to mean 7 hours 30 minutes instead of entering 7 hours and 30 minutes as 450 minutes.
What it does not do
- It does not apply overtime thresholds, premiums, rounding rules or legal break requirements.
- It assumes the same paid interval repeats for every entered day.
- It removes one unpaid break per day; split shifts need separate calculations or a manual sum.
Method and assumptions
Times are converted to minutes after midnight. Overnight adds 1,440 minutes before the finish is compared with the start. The unpaid break is subtracted once, and the result is multiplied by working days. Decimal hours divide total minutes by 60.
The tool reports a mathematical schedule. It does not decide whether a break is legally required, paid, rounded or counted as working time; those rules belong to the applicable workplace policy.
The result keeps both daily and weekly totals because each answers a different practical question. Daily hours are useful for checking a shift or a timesheet row; weekly hours are useful for a repeating rota. Comparing only the weekly decimal can conceal a break or a night boundary error in one day.
If a workplace rounds clock punches, apply that policy separately and state it beside the result. Rounding each start and finish before finding the interval can differ from rounding the final weekly total. The calculator reports the direct arithmetic of the entered minutes so the reader can see where any later policy adjustment begins.
Assumptions
- The entered break is unpaid.
- The same start, finish and break repeat on each workday.
Edge cases
- A zero break leaves the full clock interval paid.
- If the break is longer than the interval, the input is rejected rather than producing negative work.
- A shift ending at the same clock time it starts is zero hours unless overnight is selected, in which case it is a full day before the break.
Sources and corrections
Elementary formula; no external data needed. Method, rounding and corrections: see the site standards below.
Result looks wrong?
Send inputs and your expected answer; reports are checked against the formula and tests, with confirmed errors corrected publicly.